152 plants · 140.6 MW
Turn your land into a generating asset
You have the site; permitting, engineering and site work are all ours.
- Site selection and feasibility
- TEDAŞ approval and permits
- Construction and provisional acceptance

172 plants in 32 provinces
We run the whole process under one contract, from site selection to provisional acceptance.
Let's talk about your project

152 plants · 140.6 MW
You have the site; permitting, engineering and site work are all ours.
20 plants · 9.6 MW
Sized to your own consumption, and installed while you keep producing.
1
Irradiation data, grid conditions, payback range.
2
The application file and the correspondence are ours.
3
Electrical and structural design, equipment selection.
4
Mounting, modules, DC and AC works, transformer connection.
5
Testing, provisional acceptance, first generation.
6
Remote monitoring, preventive maintenance, performance reporting.
The provinces carrying the most installed capacity are below; the full breakdown is in the reference list.
See every plant on the mapEven if you are still weighing it up, we can put numbers to it. One line is enough to start.
Get in touch